Mixing the cement would take a HUGE amount of water though. They take a lot of lumber, though you could probably re-use the planks after the fact. Then you'd mix and pour cement (a very exhausting task by yourself) until the frame was filled, wait a day or two and pull the framework off.īasically, cement structures are great but really hard to build. For any decent-sized construction like a wall or floor, you would create a rebar grid inside your wooden form to give the structure extra integrity. Your average concrete construction needs to be formed out of solid plywood or stacked planks, with framing and angled braces so that the weight of the liquid cement (especially at the bottom) doesn't cause the frame to burst open (seen it happen). :3 And maybe for starters we could just have concrete floors, those aren't too hard to make are they? And it doesn't take nearly as much wood, just simple 2 by 4's would work right? Please correct me if i'm wrong. Of course I have no clue how you would do this in PZ. They ran pipes through the concrete that carried cold water, which in turn caused the concrete to cool much faster. So, instead, they did something that was fairly unique. For those of you that don't know, when the hoover dam was constructed (and finished two years ahead of schedule) they estimated it would take over 100 years for the concrete to harden. Pretty much what he said ^ Of course for larger constructions (or simply to cut the time for the concrete to harden down) the hoover dam comes to mind. With the wood and steel sticks you construct a "wall countainer" for the cement.Īfter you finished this construction, you can pour the cement in it. You need a lot of wood and also some steel sticks.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |